Installation of electric regulating valve precautions

Column:Technical article Time:2017-12-08
Installation of electric regulating valve precautionsElectric regulating valve installation should pay attention to the following aspects:1, the control valve should be installed before the pipeline cleaning...

Installation of electric regulating valve precautions


Electric regulating valve installation should pay attention to the following aspects:


1, the control valve should be installed before the pipeline cleaning, remove dirt and welding slag. After installation, in order to ensure that no impurities remain in the valve body, the valve should also be cleaned again, that is, when the medium should be opened so that all valves open to prevent impurities stuck. After using the hand wheel mechanism, should be restored to the original neutral position.


2, the control valve should generally be mounted vertically, under special circumstances can be tilted, such as the tilt angle is very heavy valve itself should be increased when the support valve protection.


3, the implementing agencies reducer after repair should pay attention to refueling lubrication, low-speed motor generally do not demolition and refueling. Assembly should also check the valve position and valve position opening instructions are consistent.


4, the control valve is a field instrument, requiring ambient temperature should be -25 ~ 60 ℃ range, relative humidity ≤ 95%. Is to install outdoor or high temperature occasions, should take waterproof, cooling measures. A source side to stay away from the vibration source or increase the anti-vibration measures.


5, electric regulating valve electrical part of the installation should be related to electrical equipment construction requirements. In the case of explosion-proof products, they should be installed in accordance with the "Installation Specification for Electrical Equipment in Explosion Hazardous Locations". Such as the scene wire SBH or other six-core or eight core, outer diameter of about Φ11.3mm rubber skin to install cable. Use and maintenance, explosion-proof area is strictly prohibited open cover maintenance and prying open the explosion-proof surface. At the same time do not disassemble knock or injury flameproof surface, after the repair to restore the original flameproof state.


6, the control valve failure or repair of the production process can continue, the control valve should be added bypass pipeline. At the same time should also pay special attention to whether the valve installation position meets the process requirements.


7, the installation of control valve pipe generally not from the surface or plate is too high, the pipe height is greater than 2m should be set as the platform, in order to facilitate the operation of the hand wheel and easy maintenance.



主站蜘蛛池模板: 亚洲国产精品久久网午夜 | 激情另类国内一区二区视频 | 亚洲欧美国产日韩天堂在线视 | 添人人躁日日躁夜夜躁夜夜揉 | 免费国产小视频在线观看 | 欧美日韩无线在码不卡一区二区三区 | 久久久久国产亚洲日本 | 亚洲精品久久久久综合网 | 日韩黄色在线播放 | 久久黄色影院 | 日本热久久| 国产成人久久综合二区 | 成人精品一区二区不卡视频 | 久久久久久中文字幕 | 日本美女影院 | 亚洲欧美日韩一区成人 | xxx在线播放| 亚洲视频在线一区二区 | 亚洲天堂网在线播放 | 欧美专区一区 | 久久青草91免费观看 | 午夜视频在线观看免费视频 | 99精品久久久久中文字幕 | 午夜香蕉视频 | 18视频在线观看网站 | 综合久久久久久久 | 91视频一区 | 日本69视频在线观看 | 欧美α一级毛片 | 在线免费观看亚洲 | 日韩亚洲人成在线 | 欧美国产在线看 | 国内精品福利视频 | 成年网站拍拍拍免费香蕉 | 日韩免费福利视频 | 综合精品视频 | 国产精品久久久久久影视 | 日韩a无吗一区二区三区 | 国产综合精品久久久久成人影 | 亚洲欧美综合一区二区三区四区 | 日日摸夜夜添夜夜添成人 |